Currently executed
The biggest Thermal Power Plant in Serbia, consisting of six unit's with total installed power of 1,650 megawatts.
Built on the right bank of the Sava River, near Obrenovac, it is the biggest individual producer of electric power in Serbian electric power system. At the average, more than 8 billion kilowatt hours are produced per year.
The chimney liner and duct, with a diameter of 11,8 meters, has been produced on-site and currently Plasticon Projects is working on the installation of the chimney liner. Finailization of the project is expected end of 2022.

The main contractor from Asia will complete the construction of a flue gas desulfurization unit at coal-fired thermal power plant by May 2023.
Plasticon Projects manufactures and installs the FRP chimney stack and ductwork related to the Flue Gas Desulfurization Unit, with a diameter of 11.8 meter and a total height of 105 meters, 140 meters above Ground Level.
