FRP Chimney Liner - Power plant takes steps to cut sulphur dioxide (SO2) emissions

  • Customer
    Power station
  • Location
    Bosnia and Herzegovina
  • Project executed
    2018
  • Dimensions 490 m3 Storage Tank
    Diameter: 8,400 mm, Height: 63,900 mm
  • Medium
    Flue gas
  • Temperature
    70 °C
  • Market segment
    Power & Energy

First FGD at RTU Ugljevik power plant

In December 2019, the first FGD gypsum was produced by the new desulfurization plant, built by an asian engineering company together with Plasticon Projects, at a power plant in Bosnia and Herzegovina.

Clean air as a must

As the thermal power plant dates from 1985, the outdated environmental safety standards of the power plant needed drastic improvement in order to comply with the European norms. In fact, clean air in a densely populated region is a ‘license to operate’ for another 25 years or more. For the engineering company the assignment was to provide a state-of-the-art desulfurization plant that would reduce the emission by a whopping 98%. With the new equipment in place, the emission is almost zero.

Plasticon Projects is ready to support you in every way

Together we can reach the top


Contact Plasticon

Wist u dat uw browser verouderd is?

Om de best mogelijke gebruikerservaring van onze website te krijgen raden wij u aan om uw browser te upgraden naar een nieuwere versie of een andere browser. Klik op de upgrade button om naar de download pagina te gaan.

Upgrade hier uw browser
Ga verder op eigen risico